Combat Hospital
Braun Surgical Clinic.
“The Best Damn Little Combat Hospital in the World”

3 Megazebos and an administration building surrounded by a perimeter wall. 6 Operating Theatres in 3 the Megazebos
| Center Core Function |
Operating Theatre fully equipped |
| CUC |
Host to all utilities, wiring, co troll panels, cable, Wii |
| Alcoves |
All open inward to the Theatre. Equipment and apparatus |
| Revenue Streams |
Military funded |
Key Innovations
- Portable. Fast erection time. Pre-engineered and modular design. Turn-key solution.
- Erected in 20 days. Dismantle in 10. Easy to re-locate.
- Over-sized pillars convey an image of strength, stability, and durability.
- Durable materials. Ceramic roof and concrete floors. Glass walls. Longevity.
- Spiral stairs for quick access to other levels. Staff efficiency. Easy to monitor.
- Abundant natural light.
- Interior open space concept. Freedom to design.
- Efficient use of space in the central utility core (CUC) and Operating Theatres
- We conserve materials. Less wire, pipe, ducting, cables, plumbing,
- Optional operating theatre in the CUC. Easy to sterilize and create a “clean room”
- Ductless heating and air conditioning. Less air carried infections. Less disease.
- Optional upper loft for staff to rest or sleep.
- Hooded vents and air scrubbers for Operating Theatre. Medical, and dental applications.
- Ceiling track suspended beds for ease of movement. Easy maintenance and cleaning.
- Full bed elevator to serve all Gazebos in the cluster.
- No exterior walls. Only plate glass and pillars. A neat and clean look
- Fire alarm and sprinkler system throughout.
- Fully Earthquake resistant design
- CUC as well as valuable OR equipment and appliances can be easily locked-down.
- All beds are IC beds.
- Designed, built, delivered, erected, equipped and furnished for under $20,000 / bed.
- The client provides the land, concrete pads, and utility access.