Surgical Clinics

3 Megazebos and a medical administration building surrounded by a perimeter wall.
6 Operating Theatres in 3 Megazebos
| Center Core Function |
Operating Theatre fully equipped |
| CUC |
Host to all utilities, wiring, control panels, cable, Wii |
| Alcoves |
All open inward to the Theatre. Equipment and apparatus |
| Revenue Streams |
Operating fees, examination fees, pharmacy, lab, retail items like glasses, and some day cremation niches in the memorial perimeter wall. |
Innovations
- Portable. Fast erection time. Pre-engineered and modular design. Turn-key solution.
- Erected in 20 days. Dismantle in 10. Easy to re-locate.
- Over-sized pillars convey an image of strength, stability, permanence, and durability.
- Durable materials. Ceramic roof, Granite floors. Glass walls. Longevity.
- Spiral stairs for quick access to other levels. Staff efficiency. Easy to monitor.
- 360 degree panoramic view.
- Abundant natural light. Windows convey transparency.
- Interior open space concept. Freedom to design.
- Efficient use of space in the central utility core (CUC) and Operating Theatres
- We conserve materials. Less wire, pipe, ducting, cables, plumbing.
- Optional operating theatre in the CUC. Easy to sterilize and create a “clean room”
- Ductless heating and air conditioning. Less air carried infections. Less disease.
- Optional upper loft for shift workers and staff to rest or sleep.
- Hooded vents and air scrubbers for Operating Theatre, medical, and dental applications.
- Ceiling track suspended beds for ease of movement. Easy maintenance and cleaning.
- Lead lined walls in CUC for imaging and X-Ray equipment
- Full bed elevator to serve all Gazebos in the cluster.
- Out-patient full radiation and chemotherapy facilities.
- Common physician suite for all Gazebos in the cluster
- No hospital visitor or emergency room traffic in the cluster.
- No exterior walls. Only plate glass and pillars. A neat and clean look
- Common intensive care unit for all Gazebos in the cluster.
- Fire alarm and sprinkler system throughout.
- Fully Earthquake resistant design.
- CUC as well as valuable OR equipment and appliances can be easily locked-down.
- All beds are IC beds. Private suites would need partitioning. Your option.
- Bed occupancy estimate is: 80% 1 day; 12% 2-3 days: 6% 4-6 days; 2% 6-10 days.
- Designed, built, delivered, erected, equipped and furnished for under $20,000 / bed.
- The client provides the land, concrete pads, utility access and some landscaping.