Highway Tourist Info Center
One Megazebo with 2 levels with washrooms in the CUC of the lower level; a kitchen / office in the upper level; and a sleeping loft for shift workers above the upper level.
| Center Core |
360 degree view |
| CUC |
Houses all utilities and 7 alcoves. |
| Revenue Streams |
Usually Government funded. |
Key Innovations
- Portable. Fast erection time. Pre-engineered and modular design. Turn-key solution.
- Erected in 20 days. Dismantle in 10. Easy to re-locate when the highway relocates.
- Over-sized pillars convey an image of strength, stability, permanence, and durability.
- Durable materials. Ceramic roof, Granite floors. Glass walls. Longevity.
- Spiral stairs for quick access to other levels.
- 360 degree panoramic view.
- Abundant natural light. Windows convey transparency.
- Efficient use of space in the central utility core (CUC)
- CUC conserves materials. Less wire, pipe, ducting, cables, plumbing
- Ductless heating and air conditioning. Less air carried infections. Less disease.
- Fire alarm and sprinkler system throughout.
- Fully Earthquake resistant design
- CUC can be easily locked-down.
- The client provides the land, concrete pads, utility access, and some landscaping.